The draft plan public review period is now closed. Thank you for your input! In fall 2017, the final plan will be presented to the Board of County Commissioners for potential adoption subsequently presented to the Planning Commission for potential adoption into the County’s Comprehensive Plan.

DRAFT BICYCLE AND PEDESTRIAN MASTER PLAN AVAILABLE FOR PUBLIC REVIEW JULY 26 – AUGUST 16

We encourage community members to download and review the draft plan to ensure that the plan meets your needs and aligns with your vision for the future. The draft plan can be viewed by clicking on the image below. An executive summary, which highlights key components of the draft plan, can be accessed by clicking here. The summary and each of the appendices to the draft plan may be also be downloaded by selecting the corresponding links below.

DRAFT Arapahoe County Bicycle and Pedestrian Master Plan Cover

 

Executive Summary

Appendix A: Public Input Summaries

Appendix B: Current Conditions

Appendix C: Wayfinding Samples

Appendix D: Pedestrian Improvement Case Studies

Appendix E: School Walk Audit Framework and Demonstration

Appendix F: Detailed Project Scoring Results

Appendix G: Arapahoe County On-Street Project Details

 

The Bicycle and Pedestrian Master Plan will reflect the goals and priorities of the Arapahoe County Open Space Master Plan and will consider the Arapahoe County Public Works and Development 2035 Transportation Plan.

 

Open Space Master Plan cover image

Jump to the Plan

Transportation Plan cover image

Jump to the Plan

 

 

 

 

 

 

 

 

 

In December 2016, the first round of public meetings for the Bicycle and Pedestrian Master Plan were held in Littleton and Byers. At these meetings, a series of informative and interactive boards were set up to both highlight the work that had been done to date on the plan and to gather additional community input. The boards can be viewed by clicking on the image below.

public-meeting-boards

In April 2017, a second round of public meetings for the Bicycle and Pedestrian Master Plan were held in Littleton and Aurora. At these meetings, a series of new boards were set up to both highlight the additional work that had been done on the plan and inform attendees about how the draft bicycle and pedestrian network was developed. The boards can be viewed by clicking on the image below.

April 2017 Public Meeting Boards